Solar Subsidy in Gujarat: Eligibility, Benefits and How to Apply

Picture of Vinoo George

Vinoo George

solar subsidy gujarat

Rooftop solar can help households in Gujarat reduce their dependence on grid electricity and lower long-term power costs. For residential consumers, the PM Surya Ghar: Muft Bijli Yojana provides Central Financial Assistance (CFA) for eligible rooftop solar installations. Understanding the subsidy amount, eligibility requirements, approved equipment and application process can help homeowners plan their installation more effectively.

PM Surya Ghar Subsidy in Gujarat

The subsidy available in Gujarat follows the central guidelines of the PM Surya Ghar scheme. For residential consumers, the CFA is calculated according to the installed rooftop solar capacity.

System CapacityCentral Financial Assistance
Up to 2 kW₹30,000 per kW
Additional capacity from 2 kW to 3 kW₹18,000 per kW
Above 3 kWNo additional CFA
Maximum CFA for an individual household₹78,000

For example, a 1.5 kW system can receive CFA of ₹45,000, while a 2.5 kW system can receive ₹69,000. A 3 kW system reaches the maximum residential CFA of ₹78,000. The scheme’s implementation guidelines specify these rates.

The subsidy is not a fixed percentage of the final installation price. The applicable CFA is calculated according to the eligible capacity and scheme rules. The actual amount a homeowner pays also depends on the vendor’s quoted system price and any additional installation requirements.

Who Can Apply for the Solar Subsidy in Gujarat?

The PM Surya Ghar scheme is available to residential consumers with a grid-connected electricity connection from the local DISCOM. Consumers submit applications through the national portal and can proceed with rooftop solar installation through registered vendors.

The scheme is demand-driven and covers residential consumers across urban and rural areas. The national program aims to support rooftop solar installations for 1 crore households by FY 2026-27.

Before applying, homeowners should ensure their electricity connection, property details and installation site meet the requirements applicable to their DISCOM.

What About DCR Requirements?

One important consideration is the Domestic Content Requirement (DCR) for subsidized residential rooftop installations. Eligible systems must comply with the applicable MNRE requirements for domestic manufacturing of solar PV cells and modules. MNRE has issued specific DCR provisions for solar PV cells under the program.

Consumers should therefore confirm that the modules selected for their subsidized installation meet the applicable DCR requirements before finalizing the purchase. MNRE also maintains the Approved List of Models and Manufacturers (ALMM) for eligible solar PV modules.

How to Apply for Solar Subsidy in Gujarat

The application process is handled through the national PM Surya Ghar portal and involves coordination with the relevant electricity distribution company.

1. Register on the National Portal

Visit the PM Surya Ghar portal and register using your residential electricity connection details. The scheme’s official portal provides the application and login facility.

2. Apply for Rooftop Solar

Enter the required electricity connection and consumer details and submit the application for rooftop solar installation.

3. Obtain the Required Approval

The concerned DISCOM processes the application according to its requirements. Technical feasibility and other applicable approvals may be required before installation.

4. Select an Impaneled Vendor

Once the application progresses, choose an eligible vendor through the scheme process. Discuss the system capacity, module specifications, inverter, mounting structure and installation requirements before finalizing the quotation.

5. Install the Solar System

The selected vendor installs the rooftop system according to the applicable technical and scheme requirements. To remain eligible for CFA, ensure that the modules and other equipment meet the applicable scheme and technical requirements.

6. Complete Inspection and Metering

After installation, the system is inspected and the required documentation is completed. The applicable metering and DISCOM verification process is then completed in accordance with the relevant state and DISCOM requirements.

7. Receive the CFA

Once the installation and verification requirements are completed, the eligible CFA is processed according to the scheme guidelines. MNRE states that after successful installation and verification by the State DISCOM, the consumer pays the balance amount to the empanelled vendor after deduction of the applicable subsidy/CFA.

Read Also: Subsidy for Solar Energy in India

Gujarat's Growing Rooftop Solar Adoption

Gujarat is among the leading states in India’s rooftop solar expansion. The wider national program had installed 39,72,447 rooftop solar systems and benefited 48,02,717 households by 22 July 2026. DISCOMs also reported that more than 18.93 lakh beneficiaries received zero electricity bills during at least one billing period after installing rooftop solar under the scheme.This growth highlights the increasing role of rooftop solar in reducing grid electricity consumption. However, the amount a household saves depends on its system capacity, electricity consumption, tariff structure, self-consumption and applicable net-metering arrangements.

Choosing Solar Modules for a Subsidized System

Subsidy eligibility should not be the only factor when selecting solar modules. Homeowners should also compare:

  • Module efficiency and rated power
  • DCR compliance
  • Applicable ALMM requirements
  • BIS and relevant product certifications
  • Product and performance warranty
  • Available rooftop area
  • Shading and roof orientation
  • Expected electricity consumption

A higher-efficiency module can be useful when roof space is limited because it can help achieve more installed capacity within the available area.

Avaada Electro manufactures N-Type TOPCon solar cells and modules in India, with manufacturing facilities in Nagpur and Dadri. For projects where domestic manufacturing, module efficiency and long-term performance matter, homeowners can compare available module specifications with their system requirements.

Final Thoughts

The solar subsidy in Gujarat under PM Surya Ghar can significantly reduce the upfront cost of an eligible residential rooftop solar system. The CFA is available at ₹30,000 per kW for the first 2 kW and ₹18,000 for the additional 1 kW, with a maximum residential subsidy of ₹78,000.

Before applying, check your DISCOM requirements, choose an eligible vendor and confirm DCR and applicable ALMM requirements for the modules. Selecting the right system capacity and technology can help maximize the long-term value of the installation.

Planning a rooftop solar project in Gujarat? Contact the Avaada Electro team for information on its N-Type TOPCon solar modules and technical specifications.

FAQs

Who qualifies for the PM Surya Ghar solar subsidy in Gujarat?

Residential consumers with an active electricity connection in their name and valid rooftop access qualify for the government central subsidy.

Homeowners receive ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, for a total of ₹78,000.

For PM Surya Ghar, DCR compliance requires the eligible solar PV modules to meet the scheme’s applicable domestic-content requirements, including the use of domestically manufactured solar PV cells and modules.

Yes, residential consumers under Torrent Power in Ahmedabad, Gandhinagar and Surat are eligible for the central subsidy.

Picture of Vinoo George

Vinoo George

Vinoo George, is a Whole-time Director of our Company. He has received bachelor’s degree in mechanical engineering from the University of Madras in 1977. He is responsible for providing strategic direction, operational efficiency, quality management technology integration and overall capacity management in our Company.

All Posts

Related Posts

7 min read

What is an On-Grid Solar System? Working, Components, Price & Subsidy

How can connecting your home directly to the sun reshape your monthly electricity bills while

6 min read

Types of Solar Energy: Photovoltaic, Thermal, CSP, Passive & Hybrid Explained (2026)

What if sunlight could power entire cities, run heavy factories and light up every home?

6 min read

Monocrystalline vs Polycrystalline vs Bifacial Solar Panels: Efficiency, Cost & Which to Choose (2026)

Have you ever wondered why two solar installations occupying a similar physical area can produce

Accolades

Awards & recognition

2026
ET Edge Best Manufacturing Brands 2026 trophy awarded to Avaada Electro

ET Edge Best Manufacturing Brands 2026

Recognised as one of the Best Manufacturing Brands 2026.

ET Edge · The Times Group
2026
CII Performance Excellence Awards 2026 certificate for Avaada Electro, Solar PV Module Manufacturing Category

CII Performance Excellence Awards 2026

Excellence in Performance for our 1.5 GW module manufacturing plant at Dadri, Uttar Pradesh.

Solar PV Module Manufacturing Category Confederation of Indian Industry
2025
CII Performance Excellence Award 2025 trophy

CII Performance Excellence Award

Leadership in Performance – Module Manufacturing.

2025
RREI 2025 certificate of excellence

Solar PV Module Manufacturing, RREI 2025

Certificate of excellence, Renewable Restart Energy India Exhibition 2025.

2025
RREI 2025 Make-in-India leader certificate

Make-in-India Leader in Solar Manufacturing, RREI 2025

Certificate of excellence, Renewable Restart Energy India Exhibition 2025.

Standards & Certifications

International certifications

Every module is built and tested to the standards that global projects demand.

Ready to Begin?

Power your future with advanced solar technology

Talk to our team about modules, cells and integrated solar solutions built in India, engineered to international standards.